constructability reviews

  • Intervene early in the design process to ensure constructability

  • Identify major conflicts, as well as potential areas of conflict

  • Work with design models to assess spatial limitations, sequencing concerns, structural clashes with systems, accessibility, and impacts to installation

  • Tag issues and create detailed reports for each design phase

OUR PROCESS

constructability reviews

Drawing & Model Review. We analyze design documents and early design models to identify gaps, conflicts, and coordination risks.

1

High-Risk Area Identification. We focus on congested spaces, critical paths, and areas where multiple systems intersect.

2

Install Feasibility Check. We evaluate whether systems can actually be installed as designed—considering clearances, access, and sequencing.

3

Clash & Conflict Analysis. We run targeted clash detection to uncover issues that may not be obvious in drawings alone.

4

Tag & Track Issues. We tag issues in the model, designating location, impact, and responsible trade. During the next design iteration, we are able to quickly identify if the problem was resolved.

5

Constructability Report. We create a detailed report identifying conflicts, potential areas of concern, and providing clear, actionable, and feasible solutions.

6

Model Fly-Through. We fly-through the model with design team and project team to present our findings and make sure we are aligned on resolutions. After the full constructability process, the project is ready to move into active coordination.